Success Story: Belimo Energy Valve Reduces District Energy Chilled Water Usage by 49%
Citizens Plaza stands in the heart of Downtown Nashville. The Class A, 275,000 square feet, the 15-story office building was constructed in 1984 and houses multiple Tennessee governmental agencies. To solve Citizens Plaza’s low Delta T syndrome and reduce thermal efficiency charges, JLL turned to Belimo. After all, 15 Energy Valves became operational in Citizens Plaza, the average flow through the building during full occupancy reduced by over 200 GPM.
More Resources Like This
Case Study
Architectural Case Study: Metal Panels at Denargo Market 3
4 MINUTE READThe mixed-use building of Denargo Market 3 required 2 types of metal panels to achieve an aesthetic look and protection again climate.
4 MINUTE READ
Case Study
Architectural Case Study: Metal Panels at Denargo Market 3
Case Study
Architectural Case Study: VTAC Louvers at 990 Bannock St.
4 MINUTE READOur architectural project at 990 Bannock St required Ruskin VTAC louvers to integrate with PTAC systems for optimal airflow and aesthetic design.
4 MINUTE READ
Case Study
Architectural Case Study: VTAC Louvers at 990 Bannock St.
Case Study
Q-PAC Project Profile: USX Tower
This case study shows how Q-PACS's fan systems can be installed quickly and save on labor-hours and improve a building's AHU.
Case Study
Q-PAC Project Profile: USX Tower
This case study shows how Q-PACS's fan systems can be installed quickly and save on labor-hours and improve a building's AHU.