This case study shows how Q-PACS's fan systems can be installed quickly and save on labor-hours and improve a building's AHU.
Q-PAC Project Profile: USX Tower
Posted on November 25, 2024
More Resources Like This
Case Study
Architectural Case Study: Rainscreens at Middle Park Health – Fraser Campus
4 MINUTE READ2 types of rainscreens were installed on Middle Park Health in Fraser, CO to match an aesthetic design, improve thermal performance, and protect the building from water damage.
4 MINUTE READ
Case Study
Architectural Case Study: Rainscreens at Middle Park Health – Fraser Campus
Case Study
Architectural Case Study: Metal Panels at Denargo Market 3
4 MINUTE READThe mixed-use building of Denargo Market 3 required 2 types of metal panels to achieve an aesthetic look and protection again climate.
4 MINUTE READ
Case Study
Architectural Case Study: Metal Panels at Denargo Market 3
Case Study
Architectural Case Study: VTAC Louvers at 990 Bannock St.
4 MINUTE READOur architectural project at 990 Bannock St required Ruskin VTAC louvers to integrate with PTAC systems for optimal airflow and aesthetic design.
4 MINUTE READ
Case Study