This case study shows how Q-PACS's fan systems can be installed quickly and save on labor-hours and improve a building's AHU.
Q-PAC Project Profile: USX Tower
Posted on November 25, 2024
More Resources Like This
Case Study
Case Study: Modernizing Security Systems for King County Housing Authority
4 MINUTE READFaced with disconnected and aging security systems, King County Housing Authority partnered with LONG to modernize their access control and video surveillance systems across their [...]
4 MINUTE READ
Case Study
Case Study: Modernizing Security Systems for King County Housing Authority
Faced with disconnected and aging security systems, King County Housing Authority partnered with LONG to modernize their access control and video surveillance systems across their [...]
Case Study
Architectural Case Study: Rainscreens at Middle Park Health – Fraser Campus
4 MINUTE READ2 types of rainscreens were installed on Middle Park Health in Fraser, CO to match an aesthetic design, improve thermal performance, and protect the building from water damage.
4 MINUTE READ
Case Study
Architectural Case Study: Rainscreens at Middle Park Health – Fraser Campus
Case Study
Architectural Case Study: Metal Panels at Denargo Market 3
4 MINUTE READThe mixed-use building of Denargo Market 3 required 2 types of metal panels to achieve an aesthetic look and protection again climate.
4 MINUTE READ
Case Study